This article outlines the best practices for detailing joints and anchorage of architectural precast panels to maintain control layer continuity, accommodate movement, and prevent air and moisture intrusion in high-performance envelopes.
Understanding Panel Movement
Precast panels experience shrinkage, thermal expansion, and structural movement. Joints must be sized to accommodate these factors and allow for sealant elasticity and anchor flexibility. Vertical and horizontal joints should align with movement analysis and building tolerances.
Joint Sealing and Control Layers
- Use backer rod and high-performance sealant (Class 50 ASTM C920)
- Tool joints to hourglass profile for stretch capacity
- Install air/vapor barriers behind panel joints using membrane wraps or gaskets
- Ensure insulation (spray or board) is continuous behind joint gaps
Anchorage Detailing
Precast anchors (gravity and lateral) must be detailed to limit thermal bridging. Use thermal isolation clips or shims where panels penetrate CI. Coordinate with structural team to prevent overloading wall framing or misalignment with back-up systems.
Common Failures and QA Tips
- Sealant over-compression or adhesion to backer rod
- Joints too narrow for expected thermal movement
- Exposed anchors causing condensation or rust stains
- Air barrier not extended behind joints
Inspect joints at 5-year intervals and test adhesion on site. Coordinate joints with aesthetic reveals and verify full depth seals where required.
Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.