Signup our newsletter to get update information, news, insight or promotions.

Fire-Resistive Joint Systems at Floor-to-Wall Connections

Prevent fire spread at critical building joints with tested fire-resistive joint systems. Explore UL systems, joint types, sealants, and installation tips for commercial and multifamily buildings.

Overview

Floor-to-wall joints are required to remain fire-resistive in many commercial and multifamily buildings. These junctions, found at slab edges and floor assemblies, can allow flames, smoke, and gases to penetrate unless properly sealed. This article explores fire-resistive joint systems, UL-rated details, and product options that ensure code compliance and life safety.

Common Joint Conditions

  • Slab edge to exterior curtain wall spandrel
  • Interior floor assembly to shaft walls or stair cores
  • Facade backup walls transitioning at each floor
  • Horizontal expansion joints at perimeter breaks

Fire-Resistance Design Strategies

  • Use UL-certified joint systems such as HW-D-0004 or FF-D-1015
  • Specify mineral wool backing plus intumescent or elastomeric sealants
  • Maintain continuity with adjacent rated construction
  • Follow required movement and compression performance
  • Verify hourly ratings per IBC Chapter 7 (typically 1- to 2-hour)

🔍 Quick Picks

🛒 Product Highlights

  • Roxul Comfortboard 80: Mineral wool board used as safing insulation to fill and protect floor-to-wall joints against flame and heat transfer.
  • 3M Fire Barrier Sealant CP 25WB+: UL-rated intumescent sealant that expands under heat to seal openings and maintain fire-resistance ratings.
  • Polyethylene Backer Rod: Provides consistent depth control and proper sealant geometry for fire-rated joints.

🧱 Used In These Assemblies

  • Slab-to-curtain wall transitions in high-rises
  • Perimeter fire containment at rated corridors
  • Mixed-use podium designs with separation joints

❓ FAQ

Is mineral wool required in fire joints?
Yes. Most UL joint systems call for compressed mineral wool as the base safing insulation.

Do fire joints need to be tested?
Absolutely. They must match listed UL or approved assemblies to meet code and inspection requirements.

🛠️ Related Articles

Conclusion

Proper fire-resistive joint treatment is essential to prevent vertical and horizontal fire spread in multi-story buildings. Follow UL listings, use code-compliant materials, and ensure that all joints maintain tested movement and integrity across the life of the building.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.

Share:

Facebook
Twitter
LinkedIn

More Posts

Send Us A Message