Signup our newsletter to get update information, news, insight or promotions.

Latest Post & Article

Latest Post & Article

Page: Blog

Residential

26 Jun 2025

Penetrations are weak points in the envelope if not flashed properly. Learn methods to seal around pipes, conduit, and equipment with confidence.

Overview

Penetrations introduce complex shapes into flat membranes, requiring multi-part flashing strategies. Standardized methods help installers avoid reliance on field improvisation. Pre-molded boots and tapes should be combined with sealants and WRB-integrated solutions.

Flashing Components

  • Wrap-type boots: Flexible collars pre-sized for conduit and pipes
  • Flexible tapes: Bond around base and integrate with WRB
  • Liquid flashing: Fills gaps and transitions at irregular or clustered penetrations

🔍 Quick Picks

Inspection Checklist

Ensure boots fit snugly and are properly adhered to the membrane. Use clamps or adhesives as recommended. Inspect for continuity with water and air barriers and test with smoke or spray tests in sensitive applications.

Conclusion

Flash penetrations with a complete system—not just caulk or tape. Use boots, reinforced tapes, and liquid sealants for robust, code-compliant seals at every pipe and wire transition.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.

Residential

26 Jun 2025

The building envelope serves four key roles: control of water, air, vapor, and heat. This article explains the function and placement of each control layer for energy efficiency and durability.

Overview

Control layers act like filters and barriers—managing moisture, air pressure, and temperature differences between indoors and outdoors. Misalignment or poor installation of these layers can lead to failures like mold, high energy bills, or structural degradation.

The Four Layers Explained

  • Water Control Layer (WCL): Typically a WRB or roof membrane
  • Air Control Layer (ACL): Seals gaps to prevent pressure-driven air movement
  • Vapor Control Layer (VCL): Often placed based on climate zone to prevent condensation
  • Thermal Control Layer (TCL): Continuous insulation reducing heat transfer

🔍 Quick Picks

Layer Integration

Align layers across penetrations and joints. Try to place all layers in a similar plane or ensure transitions and terminations properly connect. Air and water barriers are often combined into a single membrane in high-performance systems.

Conclusion

Mastering the 4 control layers is foundational for high-performance envelope design. Always coordinate details across trades and verify continuity during installation.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases

Residential

26 Jun 2025

Installing windows in commercial wall systems requires careful sequencing of pans, flashings, tapes, and sealants. This article outlines the best-practice layer order to maintain waterproofing and airtightness.

Overview

Improper sequencing of window installation layers can compromise air and water tightness. Proper execution requires understanding the order of water-shedding and airtight elements and ensuring product compatibility. This includes sill pans, pre-stripped flashings, air barrier returns, and sealants.

Best-Practice Layering Sequence

  1. Install rigid or flexible sill pan with slope to drain
  2. Apply corner boots and primered tape at sill
  3. Install window into prepared opening
  4. Backer rod and sealant around window frame perimeter
  5. Apply jamb and head flashing tapes in shingle fashion
  6. Tie WRB or air barrier to head flashing and jamb returns

🔍 Quick Picks

QA/QC Tips

Mockups should be completed for complex systems. Conduct field adhesion tests for tapes and sealants. Observe sequencing during installation to avoid reverse laps. Verify drainage through sill pans and test via spray rack as part of ASTM E1105.

Conclusion

Waterproof and air-seal your windows by carefully sequencing installation layers. Use compatible systems and adhere to tested methods to avoid callbacks and performance failures.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.

Residential

26 Jun 2025

Low-slope commercial roof assemblies require careful thermal design to avoid condensation, improve energy efficiency, and meet fire ratings. This article compares common insulation types and their best use cases.

Overview

Commercial flat roofs use several layers of insulation to meet code-required R-values and prevent thermal bridging at structural elements. These systems often use tapered insulation to promote drainage and combine different materials to achieve fire and moisture resistance.

Insulation Types Compared

  • Polyiso: High R-value/inch, commonly used but loses R-value at low temps
  • XPS: Closed-cell foam with high moisture resistance and compressive strength
  • EPS: Economical but more vapor permeable
  • Mineral Wool: Non-combustible and sound absorbing, used in fire-rated systems

🔍 Quick Picks

Additional Considerations

Always verify fire resistance using FM or UL assembly ratings. Use cover boards to protect foam layers and ensure adhesion for roof membranes. Tapered insulation systems often combine layers of ISO with varying slopes to meet drainage requirements.

Conclusion

Thermal roof insulation is not one-size-fits-all. Select materials based on compressive strength, fire rating, moisture risk, and installation sequence. Combine with tapered layouts and cover boards for the best long-term results.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.

Residential

26 Jun 2025

Not all flashing products are compatible. Learn how to choose tapes, sealants, and membranes that ensure long-term adhesion and continuity across building envelope systems.

Overview

Flashings and transition materials are critical in connecting windows, doors, joints, and dissimilar substrates. Product compatibility, UV resistance, elongation, and durability must all be considered. This article outlines key flashing categories and when to use each.

Material Categories

  • Rubberized asphalt tapes (economical, but limited UV resistance)
  • Butyl and acrylic tapes (better adhesion and aging)
  • Liquid flashings (fill irregular substrates and gaps)
  • Sill pan systems and corner boots

🔍 Quick Picks

Conclusion

Detailing continuity with the right flashing materials ensures long-term envelope integrity. Choose systems tested for your climate, substrates, and connection complexity.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.

Compatibility and Sequencing

It’s not enough to choose a high-quality flashing tape—compatibility with sealants, WRBs, and substrates matters. Always confirm chemical and adhesion compatibility using manufacturer-published technical bulletins. In the field, use primer where necessary and follow required lap shingle sequencing from bottom to top.

Residential

26 Jun 2025

Wind loads create suction and pressure on exterior cladding that must be resisted with properly engineered attachment systems. This article highlights safe and tested solutions.

Overview

In regions exposed to hurricanes or high winds, cladding systems must be engineered to resist uplift and pressure. Backing supports, fasteners, and substrate connections all play a role in resisting wind loads while preserving envelope performance.

Design Considerations

  • Follow ASCE 7 wind load tables
  • Use stainless steel or corrosion-resistant hardware
  • Anchor systems into structural backup—not just sheathing
  • Design for rain screen drainage and thermal expansion

🔍 Quick Picks

Conclusion

Wind-rated cladding attachments are essential for life safety and envelope performance in coastal and storm-prone areas. Always follow tested assemblies and use hardware proven to resist uplift and corrosion.

Disclosure: As an Amazon Associate, EnvelopeIQ earns from qualifying purchases.

Tested Systems and Load Paths

Manufacturers provide tested systems rated for Miami-Dade or ICC-ES protocols, often including both cladding clips and continuous insulation brackets. The complete load path must be engineered from face-mounted cladding, through insulation and brackets, into structural framing. Improper fastener embedment is a top reason for failure in wind uplift events.